
- Technology: Solar Photovoltaic
- Installed capacity: 79 MWp
- Country: Dominican Republic
- Construction: 2021
- Start of operation: Q1 2022
San Pedro de Macoris. Dominican Republic
• Installed capacity: 79.100 kwp.
• Investment: USD 80 million.
• Energy Generation: 121.980.000 kwh per year.
• 84 hectares and 5 kilometres of HV line.
• Installation of 149.310 solar modules.
• Direct employment: Creation of 400 new Jobs in the region.
• This park will save more than 60,000 tons of CO2 emissions per year.
