El Soco 65 MW – Photovoltaic Project in the Dominican Republic

EL SOCO

65 MW PHOTOVOLTAIC PROJECT IN DOMINICAN REPUBLIC

Technology: Photovoltaic Solar

Power: 65  MW

Market: Dominican Republic (2017)

Construction: 2017 

Start of Operation: Q4 2018 

Project Details

BAS CORPORATION es owns the “El Soco” project in the Dominican Republic for the promotion and construction of a 65 MWp (50 MWac) photovoltaic solar plant. The project was purchased from the original developer in 2016, and BAS CORPORATION has taken the necessary actions to finish obtaining permits and licenses. Currently, the project already has the definitive generation concession with the CNE (February 2017), and a PPA with the CDEEE is expected to be signed in Q2 2017.

Construction is scheduled to begin in Q2 2017. The project contemplates a Second phase of the same power, reaching between the two phases 130 MWp.